Writing a report about Oil and Fuel Filtering Machines

  • You need to submit a report file describing the actions/steps you have taken to manage and monitor your project(if you are doing your calculations in an Excel file, it would be nice to send the Excel file as well).
  • I do not like to assess your reports based on its length! The more is not the better, but please try to write at least 2000 words in your report.
  • Your WBS should contain about 15 to 20 activities.

You could start with an introduction, then describing your projectproject scope, developing the WBStime and cost estimation, determining the relationships and developing the project networkresource planningresource schedulingResource leveling, etc.)).Then, you can start implementing your project (hypothetically), and then you can provide the measurement (PV, EV, CV, SV, CVI, SPI, EAC, VAC, etc.) and compare your performance with the plan.

Briefly: after introducing your project, your project scope, your project preferences, …, you have to break down your work into 15-20 activities. Then you can apply some of the techniques to design your network. Then, I expect you to calculate the project performance measurements. Then, your analysis of the measurements is required.

course name: Business Engineering

 
"Looking for a Similar Assignment? Get Expert Help at an Amazing Discount!"